Menu

Quality & Traceability

Box Build Quality Control and Traceability

We define inspection points, serial traceability, functional test records, revision control and handover documentation around the agreed scope of each Box Build program — built from real records, not blanket promises.

  • Inspection & first-article checks
  • Serial-level traceability
  • Documented functional test records

Request a quote

Request a Box Build Scope Review

Send your drawing, BOM or idea — we reply with a practical Box Build scope review.

Need technical help instead? Contact support

Quality is planned against your build scope

Quality on a Box Build is defined per project, not promised in the abstract. We agree the control points, records and responsibilities with you, then execute and document to that plan.

Quality Planning Starts With the Build Scope

Critical-to-quality features, drawing revisions, acceptance criteria and sampling or 100%-check requirements are written into a project quality plan up front, with customer responsibilities stated so nothing is assumed.

Incoming and Kitting Controls

Enclosures, PCBAs, harnesses, COTS parts, firmware and labels are checked for identity, revision and status by risk before they enter the build, so a unit is assembled from the agreed configuration.

First Article and In-Process Verification

A first article and defined in-process checks confirm critical interfaces, fastening, routing, polarity and labeling against the drawing, with deviations approved before production continues.

Functional Test Records

Where a functional or power-on test is agreed, we record the device identity, test version, limits, result and any exceptions — committed only to the scope defined in the contract, not as a blanket guarantee.

Serialization and Unit-Level Traceability

Serial numbers can be linked to material lots, firmware, test data and packing records so an individual unit can be traced to the depth agreed for the project.

Engineering Change and Configuration Control

BOMs, drawings, work instructions, firmware and test procedures are version-controlled, with the effective unit or date recorded when a change is introduced.

Documentation and Production Handover

Inspection, test, serial, packing and change-control outputs can be assembled into a handover package as agreed — real project records only, never fabricated sample data.

Certified manufacturing systems

The manufacturing resources behind our Box Builds hold genuine, currently valid management-system registrations. The certificates below are the real documents — shown in full for verification rather than as institution logos. Product-level compliance for a specific device (for example medical or automotive product approvals) remains defined and owned by the customer.

PCBA manufacturing resource

Cable-harness manufacturing resource

Enclosure fabrication partner (supplier-held)

Related

Ready to Review Your Box Build Scope?

Have a BOM, assembly drawings, enclosure CAD, harness requirements or test procedure? Send what you have. We’ll confirm the Box Build scope, identify missing information and outline the next step before quotation.